Frames | No Frames

Return to Stylus Studio EDIFACT home page.
Return to Stylus Studio EDIFACT D96B Code List page.

8051 -

Transport stage qualifier
UN/CEFACT Revision 1996B Code List

Repr:an..3
Desc:Qualifier giving a specific meaning to the transport details.
This table also occurs in the following versions of this standard:
D00A, D00B, D01A, D01B, D01C, D02A, D02B, D03A, D03B, D04A, D04B, D93A, D94A, D94B, D95A, D95B, D96A, D96B, D97A, D97B, D98A, D98B, D99A, D99B

1Inland transport
Transport by which goods are moved from or to the frontier, or between inland points.
2At the statistical territory limit
Point by which the means of transport are presumed to have left the statistical territory of despatch or to have entered the statistical territory of arrival.
10Pre-carriage transport
Transport by which the goods are moved prior to their main carriage transport.
11At border
Transport by which goods are moved to the Customs frontier.
12At departure
Transport by which goods are moved from the place of departure.
13At destination
Transport by which goods are moved at the place of destination.
14At the statistical territory limit
Transport by which the goods are presumed to have left the statistical territory of dispatch or have entered the statistical territory of arrival.
20Main-carriage transport
The primary stage in the movement of cargo from the point of origin to the intended destination.
21Main carriage - first carrier
The first carrier of the ordered transport when more than one carrier is involved.
22Main carriage - second carrier
The second carrier of the ordered transport when more than one carrier is involved.
23Main carriage - third carrier
The third carrier of the ordered transport when more than one carrier is involved.
24Inland waterway transport
Transport by which goods are moved via an inland body of water.
25Delivery carrier all transport
Carrier responsible from the point of origin to the final delivery destination.
26
Second pre-carriage transport
Second transport by which the goods are moved prior to their main carriage transport.
27
Pre-acceptance transport
The transport by which the goods are moved to the place of acceptance.
28
Second on-carriage transport
Second transport by which the goods are moved after the main carriage transport.
30
On-carriage transport
Transport by which the goods are moved after the main carriage transport.

Change indicators
plus sign An addition.
asterisk Addition/substraction/change to a code entry for a particular data element.
hash or pound sign Changes to names.
vertical bar Changes to text for descriptions, notes and functions.
minus sign A deletion.
letter X Marked for deletion.

Return to Stylus Studio EDIFACT D96B Code List page.
EDI to XML Mapping for EDIFACT/X12 Convert EDIFACT/X12 Schemas to XML Schema Legacy Data Conversion Tools Access Relational Data as XML Visual XSLT and XQuery Mapping Tools EDIFACT to XML
Return to Stylus Studio EDIFACT home page.

Return to Stylus Studio home page.
Site Map | Privacy Policy | Terms of Use | Trademarks
Stylus Scoop XML Newsletter:
W3C Member
Stylus Studio® and DataDirect XQuery ™are from DataDirect Technologies, is a registered trademark of Progress Software Corporation, in the U.S. and other countries. © 2004-2016 All Rights Reserved.