Frames | No Frames

Return to Stylus Studio EDIFACT home page.
Return to Stylus Studio EDIFACT D03B Code List page.

8051 -

Transport stage code qualifier
UN/CEFACT Revision 2003B Code List

Repr:an..3
Desc:Code qualifying a specific stage of transport.
This table also occurs in the following versions of this standard:
D00A, D00B, D01A, D01B, D01C, D02A, D02B, D03A, D03B, D04A, D04B, D93A, D94A, D94B, D95A, D95B, D96A, D96B, D97A, D97B, D98A, D98B, D99A, D99B

1Inland transport
Transport by which goods are moved from or to the frontier, or between inland points.
2At the statistical territory limit
Point by which the means of transport are presumed to have left the statistical territory of despatch or to have entered the statistical territory of arrival.
10Pre-carriage transport
Transport by which the goods are moved prior to their main carriage transport.
11At border
Transport by which goods are moved to the Customs frontier.
12At departure
Transport by which goods are moved from the place of departure.
13At destination
Transport by which goods are moved at the place of destination.
15Main carriage - fourth carrier
The fourth carrier of the ordered transport.
16Main carriage - fifth carrier
The fifth carrier of the ordered transport.
17Main carriage - sixth carrier
The sixth carrier of the ordered transport.
18Main carriage - seventh carrier
The seventh carrier of the ordered transport.
19Main carriage - eighth carrier
The eighth carrier of the ordered transport.
20Main-carriage transport
The primary stage in the movement of cargo from the point of origin to the intended destination.
21Main carriage - first carrier
The first carrier of the ordered transport when more than one carrier is involved.
22Main carriage - second carrier
The second carrier of the ordered transport when more than one carrier is involved.
23Main carriage - third carrier
The third carrier of the ordered transport when more than one carrier is involved.
24Inland waterway transport
Transport by which goods are moved via an inland body of water.
25Delivery carrier all transport
Carrier responsible from the point of origin to the final delivery destination.
26Second pre-carriage transport
Second transport by which the goods are moved prior to their main carriage transport.
27Pre-acceptance transport
The transport by which the goods are moved to the place of acceptance.
28Second on-carriage transport
Second transport by which the goods are moved after the main carriage transport.
29Main carriage - ninth carrier
The ninth carrier of the ordered transport.
30On-carriage transport
Transport by which the goods are moved after the main carriage transport.
31Main carriage - tenth carrier
The tenth carrier of the ordered transport.
32Main carriage - eleventh carrier
The eleventh carrier of the ordered transport.
33Main carriage - twelfth carrier
The twelfth carrier of the ordered transport.

Change indicators
plus sign An addition.
asterisk Addition/substraction/change to a code entry for a particular data element.
hash or pound sign Changes to names.
vertical bar Changes to text for descriptions, notes and functions.
minus sign A deletion.
letter X Marked for deletion.

Usage indicators
Used in batch messages only.
Common usage in both batch and interactive messages.
Used in interactive messages only.

Return to Stylus Studio EDIFACT D03B Code List page.
EDI to XML Mapping for EDIFACT/X12 Convert EDIFACT/X12 Schemas to XML Schema Legacy Data Conversion Tools Access Relational Data as XML Visual XSLT and XQuery Mapping Tools EDIFACT to XML
Return to Stylus Studio EDIFACT home page.

Return to Stylus Studio home page.
Site Map | Privacy Policy | Terms of Use | Trademarks
Stylus Scoop XML Newsletter:
W3C Member
Stylus Studio® and DataDirect XQuery ™are from DataDirect Technologies, is a registered trademark of Progress Software Corporation, in the U.S. and other countries. © 2004-2016 All Rights Reserved.