Frames | No Frames

Return to Stylus Studio EDIFACT home page.
Return to Stylus Studio EDIFACT D03B Code List page.

2023 -

Period type code qualifier
UN/CEFACT Revision 2003B Code List

Repr:an..3
Desc:Code qualifying the type of the period.
This table also occurs in the following versions of this standard:
D00A, D00B, D01A, D01B, D01C, D02A, D02B, D03A, D03B, D04A, D04B

1Contract period
Period covered by the contract.
2Endorsement period
Period covered by the endorsement.
3Contract cancellation notice period
Period before which a cancellation notice must be made in order to avoid automatic renewal.
4Project period
Period of a project.
5Construction period
Period of construction.
6Test period
Period during which testing occurs.

Change indicators
plus sign An addition.
asterisk Addition/substraction/change to a code entry for a particular data element.
hash or pound sign Changes to names.
vertical bar Changes to text for descriptions, notes and functions.
minus sign A deletion.
letter X Marked for deletion.

Usage indicators
Used in batch messages only.
Common usage in both batch and interactive messages.
Used in interactive messages only.

Return to Stylus Studio EDIFACT D03B Code List page.
EDI to XML Mapping for EDIFACT/X12 Convert EDIFACT/X12 Schemas to XML Schema Legacy Data Conversion Tools Access Relational Data as XML Visual XSLT and XQuery Mapping Tools EDIFACT to XML
Return to Stylus Studio EDIFACT home page.

Return to Stylus Studio home page.
Site Map | Privacy Policy | Terms of Use | Trademarks
Stylus Scoop XML Newsletter:
W3C Member
Stylus Studio® and DataDirect XQuery ™are from DataDirect Technologies, is a registered trademark of Progress Software Corporation, in the U.S. and other countries. © 2004-2016 All Rights Reserved.