Subject:Error in dateTime editing Author:Martha J. Smith Date:01 Sep 2007 02:23 AM
When creating an XML document from an XMLSchema developed within Stylus, I was unable to use 2007-09-31 as a date; it told me that the date must be between 1-31. 2007-09-30 worked fine even if it was a bit dishonest. Is this on the known bug list?
Subject:Error in dateTime editing Author:Minollo I. Date:01 Sep 2007 08:52 AM
I'm assuming you are reporting that the error message is not correct (day must be between 1-30, rather than between 1-31, being September).
Thanks for reporting this; we'll check if it's already part of the Apache Xerces C++ error list (which is the default validation engine in Stylus Studio).